Resin infusion products
Toolfusion 3A/ 3B
High temperature infusion resin with low initial cure temperature
Toolfusion 3A/ 3B is a two part low viscosity epoxy infusion resin formulated to produce pre-preg quality, composite molds. Toolfusion 3A/ 3B
has a low initial cure temperature of 120 F (49 C) and can be post cured to achieve a high glass transition temperature of 425 F (218 C). Void
contents of less than 1% are achievable. Toolfusion 3A/ 3B will work in various RTM and VARTM processes including single and double bag
arrangements to produce autoclave quality laminates.
Resin infusion process delivers very high quality laminates with low manufacturing costs, no refrigeration
costs, no autoclave running costs.
Low initial cure temperature for low thermal expansion e ect during curing and ability to use low cost master
model materials.
Nano technology delivers outstanding toughness & high Tg. (425 F or 218 C) for long tool life and reduced life
cycle cost.
Low viscosity allows infusion of thicker and more complex laminates with fewer resin feed lines.
In comparison to metallic tools, Toolfusion 3A /3B composite tools are lighter weight for easier
manual handing.
In comparison to metallic tooling, Toolfusion 3A/ 3B composite tools have faster heat up and cool down
rates for reduced production costs.
Toolfusion 3A/ 3B composite tooling laminates have vacuum integrity for vacuum bag processing of parts in
oven and autoclave.
Test method
Material type Epoxy
Color Black : Clear (A : B)
Mix ratio by weight 100 : 85 (A : B)
Pot life 300 minutes (100 g at 72 F or 22 C)
DESCRIPTION
BENEFITS
TECHNICAL DATA

Viscosity (initial at 72 F or 22 C) 450 cps
Density (mixed) 1.13 g/cm
Glass transition temperature 425 F (218 C)
Hardness 89 Barcol ASTM D2583
Shrinkage 0.9%
Shelf life 12 months from date of shipment when stored in
original packaging at 72 F (22 C)

Packaging Part A Packaging Part B Weight Part A Weight Part B
5 gallons 5 gallons 45 lbs (20.4 kg) 40 lbs (18.1 kg)
Initial cure:
Cure laminate on master model with full vacuum applied.
Raise temperature to 120 F (49 C) and hold for 12 hours.
Remove vacuum bagging materials and attach back-up structure if required.
Carefully remove the laminate continue with post cure.
Post cure schedule:
Ramp to 150 F (65 C) and hold for 60 minutes.
Ramp to 200 F (93 C) and hold for 60 minutes.
Ramp to 250 F (121 C) and hold for 60 minutes.
Ramp to 300 F (149 C) and hold for 60 minutes.
Ramp to 350 F (177 C) and hold for 60 minutes.
Ramp to 400 F (204 C) and hold for 120 minutes.
3
SIZES
CURING DATA

Last updated : 2020-08-26
Print this page Download this page Print SDS Download SDS
As the conditions or methods of use, including storage, are beyond our control, Airtech International, Inc. does not assume responsibility for the performance
of this material for any particular use. The material is sold “as is”. Airtech International, Inc. disclaims, and buyer waives, any and all implied warranties,
including without limitation the implied warranties of merchantability and of tness for particular use. The information contained herein represents typical
properties and should not be used for speci cation purposes. Any translation is provided for your convenience only. The o cial language is English and the
o cial law is California, USA.
Part A and Part B are sold separately.
NOTES
previous next